The San Isidro solar park, with a total installed capacity of 10.66 MWp, is PMGD Project in execution stage and was connected to the grid in December 2024.
Installed capacity: | 10.66 MWp |
Panels: | Jinko Solar |
No. of panels: | 19,264 pcs |
Inverters: | Chint Power |
Trackers: | Powerway |