El Conquistador 2023

Chile

The El Conquistador solar park, with a total installed capacity of 2.97 MWp covers an area of 6.51 hectares and is the third of a total of 6 planned photovoltaic projects by the SOLEK Group in the town of Quirihue in the Ñuble region, south of the capital Santiago.

Technical specifications:

Installed capacity: 2.97 MWp
Panels: HTSAEE
No. of panels: 6 720 pcs
Inverters: SunGrow
Trackers: PowerWay


Map:

Galerie:

Projects under implementation