The Pueblo Seco Park, with a total installed capacity of 10.61 MWp, was completed in March 2023 and is located in the Ñuble Region.
Installed capacity: | 10.61 MWp |
Panels: | RISEN |
No. of panels:: | 19 656 pcs |
Inverters: | SunGrow |
Trackers: | PowerWay |