The El Trigal Park, with a total installed capacity of 10.61 MWp, was completed in August 2023 and is located in the Metropolitana Region.
Installed capacity: | 10.61 MWp |
Panels: | Jinko Solar |
No. of panels: | 19 656 pcs |
Inverters: | SunGrow |
Trackers: | PowerWay |