The Romero Solar Park, with a total installed capacity of 10.64 MWp, was completed in autumn 2021 and is located in the Maule region. The plant is owned and operated by the SOLEK Group, which continues to provide O&M services to the plant to ensure that it provides maximum efficiency as a fully operational plant. The solar park is built under the PMGD regime, a distributed energy resource whose spatial diversification ensures Chile's energy security.

Technical specifications:

Installed capacity: 10.64 MWp
Panels: Trina Solar
No. of panels: 24 192 pcs
Inverters: SunGrow
Trackers: PowerWay