The Aeropuerto solar park, with a total installed capacity of 6.58 MWp, was connected in 2021 and new modules were added in May 2022 to increase the plant's capacity. It is located in the O'Higgins region. The plant was built for the Rockville Investment Company, and the SOLEK Group continues to provide O&M services to the plant to ensure it provides maximum efficiency as a fully operational plant. The solar park is built under the PMGD regime, a distributed energy resource whose spatial diversification ensures Chile's energy security.
Installed capacity: | 6.58 MWp |
Panels: | Trina Solar |
No. of panels: | 16 028 pcs |
Inverters: | SunGrow |
Trackers: | PowerWay |