Romero
MWp 10.66 Year 2021 Location Romeral, Maule, Chile
MWp 7.22 Year 2021 Location Bulnes, Ñuble, Chile The Meco Chillan solar park, with a total installed capacity of 7.22 MWp, is another power plant by the SOLEK Group near the city of Quirihue in the Ñuble region, south of the Chilean capital, Santiago. The development of photovoltaics in the area goes hand in hand
Parque Meco Chillan Read More »
MWp 10.64 Year 2021 Location Ovalle, Coquimbo, Chile The Ovalle Norte solar park, with a total installed capacity of 10.64 MWp, is another project of the SOLEK Group in the Maule region, south of the Chilean capital, Santiago. The completed power plant was connected to the National Electric System in 2021. It was built under
MWp 7.13 Year 2020 Location San Javier, Maule, Chile The El Paso solar park, with a total installed capacity of 7.13 MWp, is another power plant by the SOLEK Group built under the PMGD regime for distributed energy resources. Chile ensures its energy security through the territorial diversification of these sources. The project is located
MWp 2.99 Year 2020 Location Parral, Maule, Chile The Bicentenario solar park, with a total installed capacity of 2.99 MWp, was connected to the grid in 2020. In February 2021, the SOLEK Group sold the project to the investment company Rockville Energy Holdings SpA, part of the Rockville Capital Group. SOLEK Group continues to provide
MWp 10.34 Year 2020 Location Villa Alegre, Maule, Chile Description The Santa Fe solar park, with a total installed capacity of 10.34 MWp, is another SOLEK Group power plant built under the PMGD regime—distributed energy resources through which Chile ensures its energy security by diversifying its power generation geographically. Located in the Maule region, south
MWp 10.66 Year 2020 Location Villa Alegre, Maule, Chile Description The Villa Alegre solar park, with a total installed capacity of 10.66 MWp, is another SOLEK Group power plant in the Maule region, south of the Chilean capital, Santiago. It was connected to the grid in 2020 and built under the Pequeños Medios de Generación
MWp 2.98 Year 2020 Location Cabildo, Valparaíso, Chile The Los Paltos solar park, with a total installed capacity of 2.98 MWp, was connected to the grid in the Valparaiso region, north of the Chilean capital, Santiago, in 2019. The project is another in a series of SOLEK Group portfolio assets built under the Pequeños Medios
MWp 2.98 Year 2019 Location Retiro, Maule, Chile Description The Villa Seca solar park, with a total installed capacity of 2.98 MWp, is another SOLEK Group power plant in the Maule region, south of the Chilean capital, Santiago. It was connected to the grid in 2019 and built under the Pequeños Medios de Generación Distribuida
MWp 2.99 Year 2018 Location Ovalle, Coquimbo, Chile The Amparo del Sol solar park, with a capacity of 2.99 MWp, is located in the Coquimbo province of Chile near the city of Ovalle. Since its connection in 2018, it has utilized the high levels of solar radiation typical of this semi-desert region. The project is