San Eduardo
MWp 2.99 Year 2024 Location San Eduardo, Ñuble, Chile
MWp 2.74 Year 2024 Location San Vicente, O’Higgins, Chile The Los Mayos solar park, with a total installed capacity of 2.74 MWp, is located in San Vicente de Taguatagua, in the O’Higgins region.
MWp 2.99 Year 2024 Location Los Ángeles, Bío-Bío, Chile The Hurtado solar park, with a total installed capacity of 2.99 MWp, is located in Los Angeles, in the Bio Bio region.
MWp 2.99 Year 2024 Location Retiro, Maule, Chile The Don Flavio solar park, with a total installed capacity of 2.99 MWp, is currently under construction and is located in the Maule region.
MWp 10.61 Year 2023 Location San Ignacio, Ñuble, Chile The El Trigal solar park, with a total installed capacity of 10.61 MWp, was completed in August 2023 and is located in the Metropolitan region.
MWp 10.61 Year 2023 Location San Ignacio, Ñuble, Chile The Pueblo Seco solar park, with a total installed capacity of 10.61 MWp, was completed in March 2023 and is located in the Ñuble region.
MWp 2.99 Year 2023 Location Monte Patria, Coquimbo, Chile The El Palqui solar park, with a total installed capacity of 2.99 MWp, was completed in August 2023 and is located in the Coquimbo region.
MWp 2.97 Year 2023 Location Quirihue, Ñuble, Chile The El Conquistador solar park, with a capacity of 2.97 MWp, is the third project by the SOLEK Group in the Ñuble region, north of the city of Quirihue. The development of photovoltaics in the area goes hand in hand with Chile’s national climate goal of becoming