Curicura

MWp 10.64
Year 2021
Location
Romeral, Maule, Chile
The Curicura solar park, with a total installed capacity of 10.64 MWp, was connected at the end of 2021. It is located in the Maule region. The power plant was built for an investment fund of Rockville; the SOLEK Group continues to provide O&M services to ensure maximum efficiency and full operational functionality. The solar park was developed under the PMGD regime for distributed energy resources, through which Chile ensures its energy security by diversifying power generation sources across its territory.