| MWp | 10.61 |
|---|---|
| Year | 2022 |
| Location |
Paine, Santiago Metropolitan Region, Chile |
The Cantillana solar park, with a total installed capacity of 10.61 MWp, was completed in June 2022 and is located in the Metropolitan region.

| MWp | 10.61 |
|---|---|
| Year | 2022 |
| Location |
Paine, Santiago Metropolitan Region, Chile |